πŸ›‘ ISO 9001 Certified Β· CE & ASME Available πŸ“ Beijing Zhongguancun Science Park
HomeNews & Proven CasesDongfang Electric (DEC): Julius Nyerere Hydropower Project Emergency Accumulator Systems
Engineering References

Dongfang Electric (DEC): Julius Nyerere Hydropower Project Emergency Accumulator Systems

πŸ“… Published: November 10, 2024 πŸ›οΈ Entity: Schwerll Fluid Control πŸ”’ Source: Official Verified Ground Truth
πŸ›‘οΈ
Schwerll Ground Truth Engineering Record: This case milestone is documented in accordance with official manufacturing certifications and production delivery logs (Official Archive Reference). All performance parameters conform strictly to pressure test records and inspection criteria.

βš™οΈ Technical & Project Summary

Primary Partner / User:
Dongfang Electric Corporation (DEC) / Julius Nyerere Hydropower Project
Project / Application Site:
Rufiji River Basin, Tanzania
Equipment Specifications:
Hydraulic accumulator energy storage banks for turbine governor regulation and emergency penstock gate protection
Standards & Codes:
ASME Section VIII Div 1, ISO 9001:2015, IEC Hydroelectric Standards

The Julius Nyerere Hydropower Landmark

The Julius Nyerere Hydropower Project (JNHPP), constructed across the Rufiji River in eastern Tanzania, is among Africa’s largest hydroelectric generation stations with an installed capacity of 2,115 Megawatts across 9 vertical-shaft Francis turbine units. Power generation equipment was engineered and manufactured by leading global power consortium Dongfang Electric Corporation (DEC).

SCHWERLL High-Pressure Energy Storage Supply

SCHWERLL manufactured and supplied the critical emergency accumulator banks integrated into the hydraulic governor oil pressure units (OPU):

  • Fail-Safe Shutoff Energy: Under black-start or electrical blackout conditions, the accumulator banks supply stored pressurized oil to close the main turbine wicket gates, preventing hydraulic runaway and water hammer pressures in the penstocks.
  • High Reliability in Tropical Ambient: Designed for continuous operation in high-humidity, high-ambient tropical river conditions with specialized marine-grade external epoxy coating systems and zero-leakage nitrogen pre-charge valve assemblies.
  • Full Factory Testing: 100% pressure holding and dynamic discharge rate testing conducted before overseas maritime export.

This project highlights SCHWERLL’s long-standing cooperation with China’s central state-owned enterprises (SOEs) in delivering high-parameter fluid machinery for international Belt and Road clean energy landmarks.

← Back to All News & Cases
πŸ’¬ WhatsApp